Location. This role is remote-based (approximately 20–30% travel to project sites and vendor/GC locations)
Global vendor liaison & permitting compliance — Identify, vet, and liaise with domestic/international architecture vendors and local permitting/code consultants on every active project site, confirming each can produce building designs and permit submissions compliant with local building, fire, and life-safety codes (IBC and its international/AHJ equivalents)
Site due diligence & code/permitting risk assessment — Own early-stage architectural due diligence for new sites globally: evaluating local zoning, building code, and permitting pathways, and flagging vendor gaps or approval risk before they cause late-stage redesign or slip a permitting timeline
Standardized, modular campus design — Develop and maintain a repeatable architectural concept for Modular Data Center (MDC) buildings, auxiliary buildings (administration/office, security, support spaces), and overall campus layout, defining a consistent design language that scales across geographies instead of a one-off design per site
In-house design for new products and sites — Personally develop architectural design for new Armada products and first-of-a-kind site conditions where no vendor solution or precedent yet exists, establishing the design basis in-house before handing off to local architects and permitting consultants for jurisdictional review and approval
Life safety, occupancy & operational workflow integration through construction — Act as the architectural point of contact linking Armada product/engineering with international architects, general contractors, and local code consultants, ensuring life-safety, occupancy, and operational workflow requirements carry through correctly from design into fabrication, installation, and as-built construction
Architectural governance, documentation & operational readiness sign-off — Build and maintain architectural design standards, permitting checklists, and code-compliance workflows by geography; track open architectural/permitting items across active sites; and provide the final sign-off confirming MDC and site are permitted, code-compliant, and ready for operational handoff